Incorrect handling of H/2 GOAWAY followed by SETTINGS frames
Get instant alerts when new vulnerabilities affect envoy - before attackers find them.
Envoy is an open source L7 proxy and communication bus designed for large modern service oriented architectures. In affected versions Envoy transitions a H/2 connection to the CLOSED state when it receives a GOAWAY frame without any streams outstanding. The connection state is transitioned to DRAINING when it receives a SETTING frame with the SETTINGS_MAX_CONCURRENT_STREAMS parameter set to 0. Receiving these two frames in the same I/O event results in abnormal termination of the Envoy process due to invalid state transition from CLOSED to DRAINING. A sequence of H/2 frames delivered by an untrusted upstream server will result in Denial of Service in the presence of untrusted **upstream** servers. Envoy versions 1.19.1, 1.18.4 contain fixes to stop processing of pending H/2 frames after connection transition to the CLOSED state.
Our own answer: ranges merged, affected separated from platform-only, with confidence and review flags.
No remediation guidance has been written for this CVE yet. What the record does show:
Patch and advisory references
Get alerted
Track the products you run and VulnTracker tells you when a new CVE affects them — with what is known about fixing it, and nothing about the rest.